City of Santa Maria Bid 2019/01

Construction of the Blosser Road right turn lane at West Main Street, adding a lane, curb, gutter, sidewalk and curb ramp, signal and cabinet, and all other work necessary.
  Plan Sheets (click to expand/collapse)
Name Size
01 Title 7.1 MB
02 C-1 7.4 MB
03 PD-1 4.7 MB
04 E-1 6.1 MB
05 E-2 5.1 MB
06 D-1 7.0 MB