Bid 20-06 Lucia Mar Unified School District Arroyo Grande Oil Fused Cut-Outs

Scope of work to include replacement of 5kv Oil-Fused-Cutouts and connected equipment; demo and properly dispose of electrical equipment; install new sub-stations, fused switches, EPR cable and testing, load-breaks, vaults, panel boards; concrete slab cutting, removal and replacement; fabrication of concrete housekeeping pads; seismic fastening, and equipment commissioning per attached plan-set, specification book, and special instructions. Some materials require long lead and manufacture times. Contractor to plan accordingly to meet required timeline.

Status

Bidding Closed

Prebid Date1/29/20 9:00 am

Bid Date2/24/20 2:00 pm

Company

Lucia Mar Unified School District

Location

Arroyo Grande, CA