Cayucos Sustainable Water Project Offsite Pipeline and Toro Creek Crossing

The project consists of creating a complete and functional influent and effluent conveyance pipelines between the Water Resource Recovery Facility and the Lift Station 5 as described and implied in all of the volumes and contract documents.
  Vol 2 Drawings - Combined PDF (click to expand/collapse)
  Vol 2 Drawings - Separate PDFs (click to expand/collapse)
Name Size
00 Vol 2_CSWP Pipeline_Drawings 75.9 KB
01 Title Sheet 130.1 KB
02 56-C002 50.7 KB
03 56-C101 319.8 KB
04 56-C102 422.8 KB
05 56-C103 389.9 KB
06 56-C104 452.5 KB
07 ECP-C101 1.0 MB
08 ECP-C102 825.1 KB
09 ECP-C103 795.6 KB
10 ECP-C104 897.0 KB
11 ECP-C501 314.0 KB