Drought Relief and Resilience Project – Well Equipping and Pipeline Package
The Project consists of equipping a production well, constructing a new booster pump station, installing electrical conduit, and installing a conveyance pipeline from the well to the existing water system infrastructure, as described and implied in the Contract Documents. The work generally includes: mobilization; site preparation; trenching; furnishing materials for project; site wiring and controls installation, submittal and document preparation; compliance with regulatory requirements; surveying; temporary facilities; site maintenance, safety and security; testing; demobilization; and all labor, equipment, and incidentals required, to construct a ready for operation equipped well, booster station, and conveyance pipeline.
Project Drawings-Combined PDF
(click to expand/collapse)
Name | Size | ||
240722_BCMWC-WELL_PIPE DRAWINGS_BID SET | 13.8 MB |
Project Drawings - Separate PDFs
(click to expand/collapse)
Name | Size | ||
001- T-1 | 1.0 MB | ||
002- G-1 | 382.4 KB | ||
003- G-2 | 462.0 KB | ||
004- G-3 | 946.1 KB | ||
005- C-1 | 384.5 KB | ||
006- C-2 | 361.7 KB | ||
007- C-3 | 372.4 KB | ||
008- C-4 | 376.5 KB | ||
009- C-5 | 365.6 KB | ||
010- C-6 | 338.4 KB | ||
011- C-7 | 375.5 KB | ||
012- C-8 | 3.5 MB | ||
013- M-1 | 380.0 KB | ||
014- M-2 | 435.8 KB | ||
015- M-3 | 424.8 KB | ||
016- M-4 | 359.9 KB | ||
017- S-1 | 234.1 KB | ||
018- S-2 | 134.1 KB | ||
019- S-3 | 197.3 KB | ||
020- S-4 | 160.7 KB | ||
021- GE-1 | 341.0 KB | ||
022- GE-2 | 279.8 KB | ||
023- GE-3 | 425.2 KB | ||
024- GE-4 | 400.4 KB | ||
025- E-1 | 241.8 KB | ||
026- E-2 | 899.6 KB | ||
027- E-3 | 395.9 KB | ||
028- E-4 | 365.3 KB | ||
029- E-5 | 225.3 KB | ||
030- E-6 | 276.7 KB | ||
031- E-7 | 411.7 KB | ||
032- E-8 | 223.1 KB | ||
033- E-9 | 318.2 KB |