Nipomo CSD Frontage Road Trunk Sewer Replacement Project

The project work involves construction of approximately 210 feet of 8-inch PVC sewer pipe, 3,030 feet of 15-inch PVC sewer pipe, 365 feet of 16-inch HDPE sewer pipe, and 1,143 feet of 18-inch PVC sewer pipe. Approximately 365 feet of pipe will be installed using pilot tube guided auger bore methods. Option for installation of pipe using pipe bursting methods is provided and indicating on the drawings. The work will also include reconnection of ten sewer laterals and installation of nineteen new polymer manholes.

Status

Accepting Bids

Prebid Date 2/19/25 10:00am
Bid Date 3/13/25 2:00pm

Company

Nipomo Community Services District

Location

Nipomo, CA

MANDATORY PRE-BID CONFERENCE: Prospective bidders are required to attend a mandatory pre-bid conference that will begin at 10 AM, local time, on February 19, 2025 at 509 Southland Street, Nipomo, California 93444. Following the conference, the meeting will reconvene at the project Site. Transportation from 509 Southland Street, Nipomo, California will be the responsibility of prospective bidders. The purpose of the conference is to discuss the scope of the project and bidding requirements. Detailed technical questions may be submitted in writing but they will be answered, if warranted, by addenda later. Oral statements may not be relied upon and will not be binding or legally effective. Attendance at the pre-bid conference and site visit is mandatory and failure to attend the pre-bid conference and site visit will result in your bid being rejected as non-responsive.