Cal Poly REC 43 Main Gym Roof Repair Project

Maino Construction, GC, seeks subcontractors for full cleaning and resealing of the upper roof, including upper roof monitor windows perimeter sealant replacement, replacement of grommets at barrel roof to vertical clerestory roof transition, and replace sealant at vertical to barrel roof transition. Repair all gutters at standing seam metal roofing per details. Reslope and recoating exterior stair landing with non-slip coating. Remove and reseal all through wall penetrations at eastern elevation. Review and repair all stepped roof Hi/Lo expansion joints and verify all upper stainless steel cap is sloped away from the building along the full length of the break metal cover.
Project Drawings-Combined PDF (click to expand/collapse)
Project Drawings - Separate PDFs (click to expand/collapse)
Name Size
001- G-001 1.4 MB
002- A-301 325.7 KB
003- A-701 3.4 MB
004- A-702 18.9 MB