Morro Bay HS and San Luis Obispo HS Artificial Turf – Bleachers and Sports Lighting Project
Maino Construction, GC, seeks subcontractors for work consisting of demolition, earthwork, site utilities, cement and/or lime soils treatment, foundation drilling for sports lighting, structural and site concrete, fencing, asphalt and striping, reinforcing steel, miscellaneous metals, landscape and irrigation.
Addendum 1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| MBHS FIELD ADDENDUM 1 SET | 9.7 MB | ||
| MBHS TURF FIELD ADDENDUM 1 | 159.3 KB | ||
| SLO HS FIELD ADD 1 SET | 12.8 MB | ||
| SLOHS TURF FIELD ADDENDUM 1 | 143.4 KB |
Addendum 2
(click to expand/collapse)
(click to expand/collapse)
Addendum 3
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Addendum 3 11052025 | 210.4 KB | ||
| MBHS Comments 2nd Response Letter | 1.6 MB | ||
| MBHS Comments Response | 10.2 MB | ||
| MBHS FINAL Replacement Bleachers Report | 2.6 MB | ||
| MBHS FINAL Sports Field Lighting Report | 8.0 MB |
Addendum 4
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| SLOHS TURF FIELD ADDENDUM 4 | 139.1 KB |

