Cal Poly Cloud Gateway Network Infrastructure Renewal Project
Maino Construction, GC, seeks subcontractors for new I.T. and electrical infrastructure in Building 181, Room 114. Installation of two new exterior condensing units on concrete slabs with condenser yard enclosure supporting room 114. Installation of new HVAC for cooling and humidity control of installed telecommunications equipment. Installation of underground electrical and refrigerant lines from enclosure to room 114. Installation of a new generator on concrete slab. Work around the generator includes demolition of existing planter area and installation of a new retaining wall. Further work includes waterproofing of wall penetrations, concrete flatwork replacement, and underground utilities.
Plan Holders
Date | Company | Contact |
4/9/24 9:34 am |
Central California Builders' Exchange
1244 N. Mariposa Fresno, CA 93706 |
Plan Room
Tel: 559-237-1831
Fax: 559-264-2532
|
4/9/24 9:34 am |
Central Coast Builders Association
242 E. Romie Lane Salinas, CA 93901 |
Christie Cromeenes
Executive Director
Tel: 831-758-1624
Fax: 831-758-6203
|
4/19/24 8:11 am |
Construct Connect
30 Technology Parkway S Norcross, GA 30092 |
Michael Redmond
Content Specialist
Tel: 8004243996
Fax: 323-602-5079
|
4/12/24 12:38 pm |
DCN
300 American Metro Blvd Ste 185 Hamilton, NJ 08619 |
Lori Bachman
Tel: 8443263826
Fax: 253-537-3597
|
4/9/24 9:34 am |
SLO County Builders Exchange
153 Cross St. #130 San Luis Obispo, CA 93401 |
Plan Room
Plan Room
Tel: 805-543-7330
Fax: 805-543-7016
|
4/9/24 9:34 am |
Santa Maria Valley Contractors Association
2003 Presiker Ste. A Santa Maria, CA 93454 |
Plan Room
Tel: 805-925-1191
Fax: 805-922-2983
|