Cal Poly Cloud Gateway Network Infrastructure Renewal Project

Maino Construction, GC, seeks subcontractors for new I.T. and electrical infrastructure in Building 181, Room 114. Installation of two new exterior condensing units on concrete slabs with condenser yard enclosure supporting room 114. Installation of new HVAC for cooling and humidity control of installed telecommunications equipment. Installation of underground electrical and refrigerant lines from enclosure to room 114. Installation of a new generator on concrete slab. Work around the generator includes demolition of existing planter area and installation of a new retaining wall. Further work includes waterproofing of wall penetrations, concrete flatwork replacement, and underground utilities.
Project Drawings-Combined PDF (click to expand/collapse)
Project Drawings - Separate PDFs (click to expand/collapse)
Name Size
001- T-1.0 1.5 MB
002- CG-1 2.1 MB
003- CG-2 2.1 MB
004- CG-3 2.1 MB
005- FD-1 4.7 MB
006- PT-1 4.4 MB
007- FS-1 4.1 MB
008- FS-2 826.2 KB
009- AD-1 1.0 MB
010- SP-1 363.7 KB
011- SP-2 310.3 KB
012- A-0 850.3 KB
013- A-1 137.7 KB
014- A-2 238.2 KB
015- A-3 308.3 KB
016- A-4 666.6 KB
017- A-5 236.1 KB
018- A-6 738.4 KB
019- SH-01 1.0 MB
020- SH-02 1.0 MB
021- SH-03 5.4 MB
022- SH-04 7.6 MB
023- SH-05 1.7 MB
024- SH-06 1.5 MB
025- SH-07 1.0 MB
026- MP-0.0 788.1 KB
027- MP-0.1 750.2 KB
028- MP-0.2 586.9 KB
029- MP-0.3 943.4 KB
030- MP-1.0 314.2 KB
031- MP-2.0 390.6 KB
032- MP-2.1 2.1 MB
033- MP-2.2 2.1 MB
034- MP-2.3 342.2 KB
035- MP-3.0 413.3 KB
036- MP-4.0 363.3 KB
037- MP-5.0 327.9 KB
038- E-001 220.8 KB
039- E-100 220.1 KB
040- E-101 244.5 KB
041- E-101 1.9 MB
042- E-110 504.8 KB
043- E-200 430.2 KB
044- E-210 555.7 KB
045- E-220 430.7 KB
046- E-300 323.0 KB
047- E-301 247.0 KB
048- E-302 250.4 KB
049- E-303 1.8 MB